OHSU Hospital Expansion Project
OHSU offers select multimedia assets for use by news outlets. (Commercial use is prohibited without prior written consent.)
When using these materials, please:
-
Credit photos and video with “OHSU/Photographer name.” Photographer name, caption and usage restrictions are embedded in the image metadata. Do not alter the content/nature of the photo. Color correction and cropping are allowed.
-
Audio and video clips should be credited to OHSU.
For more information, please contact OHSU Strategic Communications at news@ohsu.edu or 503-494-8231.
President Shereef Elnahal, M.D., walks through the new inpatient building
The OHEP Inpatient Addition (IPA) is a 14-story inpatient building (on the former School of Dentistry site), will add 184 inpatient beds, which increases hospital capacity by about a third. The Inpatient Addition is slated to open in mid-2026. (OHSU/Christine Torres Hicks)
A view from the new building
The OHEP Inpatient Addition (IPA) is a 14-story inpatient building (on the former School of Dentistry site), will add 184 inpatient beds, which increases hospital capacity by about a third. The Inpatient Addition is slated to open in mid-2026. (OHSU/Christine Torres Hicks)
Construction continues
The OHEP Inpatient Addition (IPA) is a 14-story inpatient building (on the former School of Dentistry site), will add 184 inpatient beds, which increases hospital capacity by about a third. The Inpatient Addition is slated to open in mid-2026. (OHSU/Christine Torres Hicks)
President Shereef Elnahal, M.D., walks through the new inpatient building
The OHEP Inpatient Addition (IPA) is a 14-story inpatient building (on the former School of Dentistry site), will add 184 inpatient beds, which increases hospital capacity by about a third. The Inpatient Addition is slated to open in mid-2026. (OHSU/Christine Torres Hicks)
OHSU Hospital Expansion Project 2024
The OHEP Inpatient Addition (IPA) is a 14-story inpatient building (on the former School of Dentistry site), will add 184 inpatient beds, which increases hospital capacity by about a third. The Inpatient Addition is slated to open in mid-2026. (OHSU/Christine Torres Hicks)
- Latest Stories
- Popular